I. Project overview
Project Address: Congo (Brazzaville), Africa
Product name: Active lime production
Production scale: Annual output of 50,000 tons of active lime production line
Service scope: from raw material storage and transportation, preheating, calcination, cooling to finished product storage and transportation system, environmental dust collection system, exhaust dust removal, desulfurization and deodorization system, electrical automation control system process design, plant planning, equipment supply, equipment installation and commissioning, after-sales training and other one-stop technical services.
II. Project description
This project aims to build a lime shaft kiln in the Congo region of Africa to meet the needs of copper mine demineralization.
III. Project design principles
(1) Under the premise of meeting the requirements of production scale, the main machine adopts single machine and single line equipment to achieve the purpose of smooth and compact production line, save land and improve land utilization rate.
(2) The auxiliary equipment is stable, reliable and energy-saving as the principle to ensure normal production, high quality and low energy consumption.
(3) Fully combined with the local natural conditions, under the condition of meeting the process production conditions, optimize the design scheme and reduce the project cost as much as possible.
(4) Conscientiously implement the relevant environmental protection, laws, regulations and standards, strictly control environmental pollution, reduce pollutant emissions, protect and improve the environment, and achieve safe and civilized production.
IV. Project implementation
After the contract was signed, the engineering technology center of our company immediately carried out the actual survey of the project site, prepared the feasibility study report and the initial design plan, discussed with the owner and formulated the construction plan in July. Our company concentrated the advantages of strength, design and construction, with the strong support and cooperation of the owner, the project started on November 20, after more than 20 days of debugging, successfully reached the production standard, and was highly praised and affirmed by the owner.
V. Equipment used
NO. | name | Model number | QTY |
1 | Mechanized shaft kiln | φ 5.2 & times; 45m | 1PCS |
2 | Electric automatic control | Set up | 1SET |