Africa Congo Annual Production of 50,000 Tons of Active Lime Project
Home » CASE » Lime project » Africa Congo Annual Production of 50,000 Tons of Active Lime Project

Africa Congo Annual Production of 50,000 Tons of Active Lime Project

Views: 1893     Author: Site Editor     Publish Time: 2020-04-13      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

I. Project overview


Project Address: Congo (Brazzaville), Africa


Product name: Active lime production


Production scale: Annual output of 50,000 tons of active lime production line


Service scope: from raw material storage and transportation, preheating, calcination, cooling to finished product storage and transportation system, environmental dust collection system, exhaust dust removal, desulfurization and deodorization system, electrical automation control system process design, plant planning, equipment supply, equipment installation and commissioning, after-sales training and other one-stop technical services.


II. Project description


This project aims to build a lime shaft kiln in the Congo region of Africa to meet the needs of copper mine demineralization.


III. Project design principles


(1) Under the premise of meeting the requirements of production scale, the main machine adopts single machine and single line equipment to achieve the purpose of smooth and compact production line, save land and improve land utilization rate.


(2) The auxiliary equipment is stable, reliable and energy-saving as the principle to ensure normal production, high quality and low energy consumption.


(3) Fully combined with the local natural conditions, under the condition of meeting the process production conditions, optimize the design scheme and reduce the project cost as much as possible.


(4) Conscientiously implement the relevant environmental protection, laws, regulations and standards, strictly control environmental pollution, reduce pollutant emissions, protect and improve the environment, and achieve safe and civilized production.


IV. Project implementation


After the contract was signed, the engineering technology center of our company immediately carried out the actual survey of the project site, prepared the feasibility study report and the initial design plan, discussed with the owner and formulated the construction plan in July. Our company concentrated the advantages of strength, design and construction, with the strong support and cooperation of the owner, the project started on November 20, after more than 20 days of debugging, successfully reached the production standard, and was highly praised and affirmed by the owner.


V. Equipment used

NO. name Model number QTY
1 Mechanized shaft kiln φ 5.2 & times; 45m 1PCS
2 Electric automatic control Set up 1SET

VI. Live picture

非洲刚果年产5万吨活性石灰项目1


VI, scene pictures