English
Pilot Base 30 Tons/day Flotation Line Project (Shaanxi Province)
Home » CASE » Grinding item » Pilot Base 30 Tons/day Flotation Line Project (Shaanxi Province)

Pilot Base 30 Tons/day Flotation Line Project (Shaanxi Province)

Views: 1563     Author: Site Editor     Publish Time: 2025-01-07      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

I. Project overview


Located in Shaanxi, China, this project is called the 30t/d flotation pilot line. The scope of supply includes the following equipment:


1, overflow type ball mill: the key equipment, used to grind the ore to the size suitable for subsequent flotation.


2, flotation mixing tank: to ensure that the pulp and pharmaceutical mixed evenly before flotation.


3, flotation machine: designed for 30t/d copper, lead and zinc flotation, covering copper, lead, zinc ore multiple roughing, sweeping and selection process.


4, cyclone group: responsible for classifying and concentrating pulp, improve flotation efficiency.


5, vibration feeder: to ensure that raw materials are evenly fed into the ball mill or related processing equipment.


II. Design basis


The flotation machine design needs to meet the needs of treating copper, lead and zinc ore, and has the flexibility to adapt to the treatment of different minerals such as gold, fluorite and tungsten ore.


III. Scope of Services


Including equipment manufacturing, on-site installation and commissioning, to ensure that the production line runs smoothly according to the design requirements.


IV. Precautions


The design should take into account the physical and chemical properties of different minerals to ensure the versatility and flexibility of the equipment. For non-major minerals such as gold, fluorite and tungsten, the impact on existing equipment needs to be assessed and necessary adjustments made. At the same time, the design should allow for scalability to cope with possible future changes in demand.


V. Pictures of equipment

陕西中试基地30吨每天浮选线项目


  • Sign up for our newsletter
  • get ready for the future
    sign up for our newsletter to get updates straight to your inbox