Views: 5663 Author: Site Editor Publish Time: 2017-06-07 Origin: Site
I. Project overview
Signed Date: 2017-06-07
Processing material: Tin ore
Processing capacity: 1-3t/h
Equipment configuration: GS drum screen
In tin ore dressing, manganese ore with simple sorting structure and coarse distribution size is selected, especially for tin oxide ore with high density. In June 2017, a mining company in Bolivia due to the needs of tin ore beneficiation, after a number of manufacturers selection and investigation, ordered my company GS drum screen 1, the two sides signed the purchase contract on June 07, 2017, and the equipment test delivery on July 20, 2017.
II. Solution
The model of GS drum supplied this time is GS10× 30, the design capacity of 1-3t/h, mainly adopt the following solutions to meet customer needs:
1, according to the customer's beneficiation process, production capacity, particle size requirements, recommend equipment types for customers, develop screening programs.
2, the equipment is suitable for medium coarse, medium fine material screening, wide range of use.
3, by increasing the blocking device, solve the problem of drum screen blockage, improve the operation efficiency.
4, by increasing the sealing device, to solve the problem of dust pollution that often occurs in the production process of the drum screen.
III. Project site