Uzbekistan 150 Tons Per Day Lime Production Line Project
Signed Date: 2013-10-15Handling material: LimestoneHandling capacity: 150 tons per dayEquipment configuration: rotary kiln, vertical preheater, bucket elevatorI. Project overview: The project is located in Uzbekistan, it is a lime production line with a daily output of 150 tons. In October 2013, the
Read More
Active Lime Calcining Production Line Project(Ningxia,CHINA)
I. Project overviewProvince: Ningxia, ChinaEquipment: 2 3.2* 50m rotary kilns, 2 sets of vertical preheater, 2 sets of vertical cooler, 1 set of feeding system, 2 sets of electrical and instrument automatic control.II. Project descriptionA company in Ningxia signed a contract with our company for a
Read More
County Production 10 Tons of Pulverized Coal Preparation Project(Shaanxi Fugu CHINA))
I. Project overviewDate of signing: 2013-07-05Processing material: CoalProcessing capacity: 10t/hEquipment configuration: 24475 air sweep coal mill, MD500 powder separator, PPW700 dust collector, screw conveyor, fan, bucket elevator, gas and coal powder mixing burner, hot blast furnace systemIn July
Read More
200,000 Tons of Active Lime Production Line Project (Shuozhou, Shanxi)
Date: 2013-06-26Handling material: LimestoneProcessing capacity: 200,000 tons per yearEquipment configuration: rotary kiln, vertical preheater, bag dust collectorI. Project overviewLocated in Shuozhou City, Shanxi Province, the project was completed and put into operation in February 2009, using sha
Read More
Production Station with An Annual Output of 50,000 Tons of Pulverized Coal (Shandong Heze China)
I. Project overviewDate of signing: 2017-07-07Processing material: DolomiteProcessing capacity: annual output of 20,000 tonsEquipment configuration: rotary kiln, vertical preheater, cooler, ball mill, dust collector, electrical instrument, etcShaanxi Yulin Fugu County annual output of 20,000 tons of
Read More
Guatemala 1200 Tons Per Day Cement Grinding Station Project
I. Project overviewDate of signing: 2013-12-01Processing materials: clinker, gypsum, volcanic ashProcessing capacity: 1200 tons per dayEquipment configuration: dryer, cement mill, powder separator, mixer, conveying equipment, dust collector, siloWe built a 1200tpd cement grinding station in Guatemal
Read More
5 Tons Pulverized Coal Production Station Project (Fugu County, Shaanxi, China)
I. Project overviewDate of signing: 2017-07-07Processing material: DolomiteProcessing capacity: annual output of 20,000 tonsEquipment configuration: rotary kiln, vertical preheater, cooler, ball mill, dust collector, electrical instrument, etcShaanxi Yulin Fugu County annual output of 20,000 tons of
Read More
180,000 Tons of Light Alcohol Recovery Device (Fufeng Group,CHINA)
180,000 tons of light alcohol recovery device (Fufeng Group)
Read More
Cyclohexanone Plant (Shandong Haili Chemical Co., LTD. CHINA)
Cyclohexanone Plant (Shandong Haili Chemical Co., LTD. CHINA)
Read More
Annual Output of 20,000 Tons of Alcohol Project (Shanxi Yicheng China)
Annual output of 20,000 tons of alcohol project (Shanxi Yicheng China)
Read More