I. Project Overview:
Project address: Kunming, Yunnan, China
Product name: Disc granulator
Production scale: annual processing of 300,000 tons of phosphogypsum production line
Service scope: Experimental research and development, electrical automation control system process design, equipment supply, equipment installation and commissioning, after-sales training and other one-stop technical services.
II. Project description
In the production process, a large amount of phosphogypsum is produced, which used to be buried. Now the national environmental protection department has new requirements for this, must be environmentally friendly treatment. As a leading enterprise in the fertilizer industry, New Yangfeng is duty-bound to begin research and development of this project. After discussion and experiment with Zheng Mine, it was finally decided to build a production line with annual processing of 300,000 tons of phosphogypsum.
III. Design principles
(1) Under the premise of meeting the requirements of production scale, the main machine adopts single machine and single line equipment to achieve the purpose of smooth and compact production line, save land and improve land utilization rate.
(2) The auxiliary equipment is stable, reliable and energy-saving as the principle to ensure normal production, high quality and low energy consumption.
(3) Fully combined with the local natural conditions, under the condition of meeting the process production conditions, optimize the design scheme and reduce the project cost as much as possible.
(4) Conscientiously implement the relevant environmental protection, laws, regulations and standards, strictly control environmental pollution, reduce pollutant emissions, protect and improve the environment, and achieve safe and civilized production.
IV. Project implementation
Host equipment disc granulator for the whole country for public bidding, bidding manufacturers for seven, after more than a month 4 rounds of intense technical and business evaluation, negotiation process, our company finally won the bid in May.
After winning the bid, the engineers and technicians of our company formulated a strict implementation plan according to the technical requirements of the bidding documents, and completed the work of equipment manufacturing, installation, shipping and commissioning on time with the active cooperation and support of the project department of Party A, and the commissioning was smooth.
V. Equipment used
NO. | Name | TYPE | QTY |
1 | Disc granulator | Φ 4.2 m | 2PCS |
VI, scene pictures