Views: 2869 Author: Site Editor Publish Time: 2020-09-07 Origin: Site
I. Project overview
Project address: Liyang, Jiangsu
Date of signing: 2020-09
Processing material: sludge
II. Production site introduction
[Project highlights] : Harmlessness, reduction and resource utilization
[Project background] : A company in Jiangsu carried out harmless and resource-based treatment of sludge, and finally signed a sludge incineration project with our company after multiple investigations and comparisons.
III. Principles of project design
The use of sludge, contaminated soil and coal gangue to produce porous brick project is a solid waste treatment project, so the company's equipment not only requires equipment safety and reliability, but also requires the entire equipment with energy-saving and environmental protection process system and advanced automatic control system.
IV. Project implementation
Through repeated technical communication with various manufacturers in the early stage, the process and automation control technology of the equipment have been repeatedly communicated to determine the unified platform of the process technology scheme based on our company as the standard. In the business negotiation, our company has won the recognition of customers with the complete scope of supply and detailed production, installation, commissioning and after-sales guarantee schemes, and determined our company as the supplier of this project.
V. Equipment used
Plug type rotary kiln, roller cooling machine, roller granulator, roller screen and other main equipment.
VI. Project site